The process of transferring yarns from ring bobbins, hank, etc. into a suitable package is called winding process. It may be electrical or mechanical. in this article, we will discuss the winding mathematical problems and solutions.
![Winding Mathematical Problems and Solutions](https://www.textilecalculations.com/wp-content/uploads/2015/01/Autoconer-Winding-Machine.jpg)
Mathematical Problems and Solutions in Winding
Formulas for winding
1. Production per hour of the winding machine (For cotton)
= Surface speed of winding drum (yds/min) X 60/(840 X Yarn count) X No. of drums X Efficiency% X Waste% (lb/hr)
= Production or surface speed of each spindle X /(840 X Yarn count) X No. of spindle X Efficiency% X Waste% (lb/hr)
= Production or surface speed of each spindle X 60 X 8 X (No. of spindle/1 Spindle (Spindle)
2. Production per hour of a winding machine (For Jute)
= Surface speed of winding roller (inch/min) X 60 X Count/(36 X 14400) X No. of spindle X Eff% (lb)
3. Production per hour of the winding machine (Tex system)
= Surface speed of winding roller or spindle (cm/min) X 60 X Count/(100 X 1000) X No. of spindle x Eff.% (gm)
…………………………………….Actual production
4. Machine efficiency = ……………………………….. X 100
………………………………….Calculated production
Mathematical Problems and Solutions in Winding
1. Production per minute of a high-speed winding machine is 630 yds. What is the time required for winding 54S number’s 60,000 lb yarn onto the same 500 drums? Here efficiency is 90%.
Solution:
Here,
- Production of machine = 630 yds/min
- Yarn count = 54S
- No. of drums = 500
- Machine eff. = 90%
- Amount of yarn = 60,000 lb
- Required time =?
Production/hr (lb) = Production per min of 1 drum X 60/(840 X yarn count) X No. of drum X Machine eff.%
= 630 X 60/(840 X 54) X 500 X 90/100
= 375 lb
………………………………………………..Total amount of yarn
Time required for winding yarn = ………………………………
………………………………………………….Production per hr
= 60,000/375 hr (ANS).
2. Production per min of a winding machine is 651 yds with 100% efficiency, then calculate the required no. of winding drums to produce 46S numbers 1600 lb yarn within 8 hr with the same machine.
Solution:
Here,
- Production of a winding drum = 651 yds/min
- Machine efficiency = 92%
- Yarn count = 46S
- Amount of yarn = 1600 lb
- Required no. of drums in 8 hr =?
We know,
Production per 8 hr of a winding drum,
…………………………………………..60 X 8
= Production per min X ………………………….. X Eff.%
…………………………………..840 X Yarn count
= 651 X (60 X 8)/(840 X 46) X 92/100
= 7.44 lb
………………………………………………………………Amount of yarn
Now, Required no. of drums = ……………………………………………………………
……………………………………………..Production per 8 hr of a winding drum
= 1600/7.44
= 215.05
= 215 (ANS).
You may read also: Winding Mathematical Formulas, Problems and Solutions
3. Calculate the production per shift of each spindle of an auto-coner Winding machine from the following data –
- Drum speed = 2400 rpm
- Dia of drum = 3”
- Warp yarn count = the 30S
- Efficiency = 68%
Solution:
- Drum speed = 2400 rpm
- Dia of drum = 3”
- Warp yarn count = 30S
- Efficiency = 68%
- Production/Spindle/8 hr =?
We know,
………………………………………..Drums Surface speed X 60 X 8
Production/Spindle/8 hr = ……………………………………………… X Eff.%
…………………………………………………..36 X 840 X Count
…..3.14 X 3 X 2400 X 60 X 8………..68
= ……………………………………….. X …………
…………36 X 840 X 30………………….100
= 8.13 lb (ANS).